Eskom wins Innovation in Power Generation Award

By Bizclik Editor

Eskom, supplier of about 95 percent of South Africa’s power, has been honored for its innovative use of technology in power generation.

 Eskom’s Kusile power station, which is currently under construction near Emalahleni (Witbank) in Mpumalanga province, has been awarded first prize in the 2013 Be Inspired competition, in the Innovation in Power Generation category for the innovative development and use of a 3D Plant Operating & Maintenance (O&M) Simulator.

The O&M Simulator was created on 3D-Pact and Flownex technology developed by South African companies Samahnzi and M-Tech Industrial, using CADD 3D model content delivered by EPC contractors for the new power station and integrating it on the Bentley MicroStation platform before migration into the 3D-Pact Simulator technology platform.

The Bentley Innovation in Power award recognises projects that have demonstrated excellence in planning, designing, building, operating, modeling, and analysing power generation plants including traditional fossil fuel plants, combined cycle plants, nuclear power facilities, and renewable power generation.

The 3D, virtual and interactive model of Kusile allows Eskom engineers, operators and plant maintainers a thorough understanding of the plant design and lay-out, plant processes, operations and maintenance requirements.

Changing plant conditions and operating parameters can be simulated in a 3D virtual environment. The 3D simulator will also provide improved emergency preparedness capability; operators can train for abnormal or emergency situations in a simulated environment, reducing the impact of actual plant damage caused by such occurrences.

 Proactive training on the 3D plant simulator will assist in reducing the risk of “learning curve” failures during commissioning and operations.

The award ceremony took place at the Hilton Metropole hotel in London on 30 October 2013.

The 3D plant simulator project was headed by Eskom Chief Technologist Riekie Swanepoel, who accepted the award in London on behalf of the Kusile team.

“The 3D plant simulator shows that Eskom is constantly looking for innovative ways to improve the design, operations and maintenance of their power generation fleet,” said Swanepoel.

Share

Featured Articles

Abu Dhabi Airports prepares for Terminal A opening

A decade in the making, Abu Dhabi International Airport welcomes 6,000 volunteers to test operational readiness of stunning new Terminal A building

Business Chief expands portfolio with new look and coverage

Business Chief Middle East & Africa launches with fresh new look and extended coverage of the region, with exclusive executive interviews and insights

How Octopus Energy grew to become an industry giant

Octopus Energy continues to grow after a deal was agreed to acquire Shell Energy in the UK and Germany, taking its customer base to almost seven million

Perkbox CEO: How to support employees through tough times

Human Capital

How Middle East is embracing the future of digital finance

Corporate Finance

UAE Lulu Group shifts business for global growth and IPO

Corporate Finance